
Flow rate tests for fire hydrant networks
What the service includes
Periodic testing is what confirms a fire hydrant network is still delivering the efficiency and pressure it needs to. MGM ANTINCENDIO runs these flow rate tests with professional-grade instruments and an experienced team. We then compare the results against the relevant regulatory benchmarks (UNI 10779 and UNI TS 11559) and hand over a certified technical report. This kind of testing is critical for confirming the system will perform in an emergency, and it’s frequently requested during fire prevention inspections or when applying for the CPI (Fire Prevention Certificate).

MGM Antincendio
Request information
Fill in the form, we'll get back to you shortly.

